A, B and C can finish a work in 20, 25 and 100 days respectively. They started together, but B left 4 days before the scheduled completion of the work and A left 4 days before the actual completion. If they get ₹15000 for the entire work, C's share is:

  1. ₹2400
  2. ₹3500
  3. ₹7000
  4. ₹8000
Answer (Detailed Solution Below)
Option 1 : ₹2400

Detailed Solution

Concept approach

Work 100: A = 5, B = 4, C = 1. Scheduled = 100/(5 + 4 + 1) = 10 days

⇒ B left after 6 days. A + C = (100 − 6 × 4 + 4 × 5)/(5 + 1) = 16 days

⇒ C = 16/100 × 15000 = ₹2400