A alone can do a work in 11 days. B alone can do the same work in 22 days. C alone can do the same work in 33 days. They work in the following manner:
Day 1: A and B work.
Day 2: B and C work.
Day 3: C and A work.
Day 4: A and B work. And so on.
In how many days will the work be completed?

(SSC CGL Mains 2021 (08 Aug 2022))
  1. 9 days
  2. 12 days
  3. 3 days
  4. 6 days
Answer (Detailed Solution Below)
Option 1 : 9 days

Detailed Solution

Concept approach

LCM 66: A = 6, B = 3, C = 2 per day

3 days: (6 + 3) + (3 + 2) + (2 + 6) = 22

⇒ 66/22 = 3 cycles = 9 days

Ultra Calci trickLCM work (cycle)

LCM 66: A = 6, B = 3, C = 2 → pairs per day: A+B = 9, B+C = 5, C+A = 8

One 3-day cycle = 22 units → 66/22 = 3 cycles = 9 days

⇒ 12 ✗ 3 ✗ 6 ✗

⇒ 9 days ✓