A takes 6 days less than B and 2 days more than C to do a work. If the time taken by A and B together to do the work is equal to the time taken by C to do the same work, in how many days can B alone complete the same work?

  1. 10
  2. 14
  3. 12
  4. 6
Answer (Detailed Solution Below)
Option 3 : 12

Detailed Solution

Concept approach

Let B = b

⇒ A = b − 6, C = b − 8. (b − 6)b/(2b − 6) = b − 8

⇒ b² − 16b + 48 = 0

⇒ b = 12. Check: 6, 12, 4

⇒ 72/18 = 4 ✓

Ultra Calci tricktest options

A = B − 6, C = A − 2 and 1/A + 1/B = 1/C — put the options for B

B = 12: A = 6, C = 4: 1/6 + 1/12 = 3/12 = 1/4 ✓

B = 10: A = 4, C = 2: 1/4 + 1/10 ≠ 1/2 ✗ B = 14: A = 8, C = 6 ✗ B = 6: A = 0 ✗

⇒ 12 days