Working together, A and B can do a certain work in 45 days. They work together for 10 days. They complete the remaining work in 28 days with the assistance of C. The work done by C in 3 days is equal to the work done by B in 2 days. A and C together can complete 70% of the original work in:

(ICAR (2 Mar 2022))
  1. 30 days
  2. 40 days
  3. 36 days
  4. 35 days
Answer (Detailed Solution Below)
Option 3 : 36 days

Detailed Solution

Concept approach

(A+B)·35 = (A+B+C)·28

⇒ A+B : A+B+C = 4 : 5

⇒ A+B = 4, C = 1, B = 1.5 (2B = 3C), A = 2.5; work = 4 × 45 = 180

⇒ A+C = 3.5

⇒ 70% = 126

⇒ 126/3.5 = 36 days