A and B can do a piece of work in 12 days and 30 days, respectively. Both work for 4 days and then A leaves. How long (in days) will B take to complete the remaining work?

(RRB NTPC Undergraduate CBT-1 2026 (15 Jun 2026, Shift 2))
  1. 15
  2. 18
  3. 17
  4. 16
Answer (Detailed Solution Below)
Option 4 : 16

Detailed Solution

Concept approach

LCM(12, 30) = 60

⇒ A = 5, B = 2

4 days = 28

⇒ left = 32

B alone = 32/2 = 16 days