A can do 50% of the job in 16 days, B can do 1/4th of the job in 24 days. In how many days can they do 3/4th of the job working together?

(SSC CGL Mains 2017 (17.02.2018))
  1. 24
  2. 9
  3. 21
  4. 18
Answer (Detailed Solution Below)
Option 4 : 18

Detailed Solution

Concept approach

A = 32 days, B = 96 days

⇒ together = 24 days

⇒ 3/4 of job = 18 days