Selection KeySelection KeyFree Mock Test
View this question in:

A and B together can complete a piece of work in 25 days, B and C together can complete the same work in 36 days, while C and A together can complete the same work in 30 days. If A, B, C and D together can complete the same work in 18 days, then in how many days can D alone complete the same work?

(SSC CPO 2024)
  1. 180
  2. 200
  3. 210
  4. 225
Answer (Detailed Solution Below)
Option 2 : 200

Detailed Solution

Concept approach

Total work = LCM(25, 36, 30) = 900

⇒ A+B = 36, B+C = 25, C+A = 30

⇒ 2(A+B+C) = 91

⇒ A+B+C = 45.5; A+B+C+D = 900/18 = 50

⇒ D = 4.5

⇒ D alone = 900/4.5 = 200 days

Ultra Calci trickLCM work

LCM 1800 → A + B = 72, B + C = 50, C + A = 60

⇒ A + B + C = (72 + 50 + 60) ÷ 2 = 91

A + B + C + D = 1800 ÷ 18 = 100

⇒ D = 9 per day

1800 ÷ 9 = 200 ✓

⇒ 200 days

ऐसे ही सवालों के असली परीक्षा जैसे मॉक टेस्ट — मुफ़्तStart free test →