View this question in:
A, B, C and D can complete a work individually in 20 days, 25 days, 40 days and 50 days, respectively. All four work together for 2 days. Then A, B and C continue for 3 more days. Next A and B work for 4 days. Finally C returns at 150% of his original efficiency and D returns at twice his original efficiency; C and D together finish the remaining work. If ₹31,000 is divided according to actual work done, what is C's share?
(SSC CGL 2026 (24 Oct, Shift 1))
- ₹3,950
- ₹4,100
- ₹4,250
- ₹4,400
Answer (Detailed Solution Below)
Option 3 : ₹4,250
Detailed Solution
Concept approach
LCM 200: A 10, B 8, C 5, D 4 per day. Work: all 4 × 2 days = 54; A,B,C 3 days = 69; A,B 4 days = 72
⇒ done 195, left 5. C (7.5) + D (8) = 15.5/day
⇒ 10/31 day. C's work = 10 + 15 + 7.5×10/31 = 850/31. Share = 850/31 ÷ 200 × 31000 = ₹4,250.
A, B, C और D अकेले-अकेले किसी काम को क्रमशः 20 दिन, 25 दिन, 40 दिन और 50 दिन में पूरा कर सकते हैं। चारों 2 दिन साथ काम करते हैं। फिर A, B और C 3 और दिन काम करते हैं। इसके बाद A और B 4 दिन काम करते हैं। अंत में C अपनी मूल दक्षता के 150% पर और D अपनी मूल दक्षता के दोगुने पर लौटता है; C और D मिलकर शेष काम पूरा करते हैं। यदि ₹31,000 वास्तविक किए गए काम के अनुसार बाँटे जाएँ, तो C का हिस्सा क्या है?
(SSC CGL 2026 (24 Oct, Shift 1))
- ₹3,950
- ₹4,100
- ₹4,250
- ₹4,400
उत्तर (विस्तृत हल नीचे)
विकल्प 3 : ₹4,250
विस्तृत हल
कॉन्सेप्ट से हल
LCM 200: A 10, B 8, C 5, D 4 प्रति दिन। कार्य: चारों 2 दिन = 54; A,B,C 3 दिन = 69; A,B 4 दिन = 72
⇒ पूरा 195, शेष 5। C (7.5) + D (8) = 15.5/दिन
⇒ 10/31 दिन। C का कार्य = 10 + 15 + 7.5×10/31 = 850/31। हिस्सा = 850/31 ÷ 200 × 31000 = ₹4,250।
ऐसे ही सवालों के असली परीक्षा जैसे मॉक टेस्ट — मुफ़्तStart free test →