A can do 1/3 of a piece of work in 32 days, B can do 37½% of the same work in 24 days, while C can do 60% of the same work in 48 days. B and C together started and worked for x days. After x days, B left the work and A joined C and both completed the remaining work in (x + 8) days. If the ratio of the work done by (B + C) together to the work done by (A + C) together is 9 : 11, then what fraction of the same work can be completed by C alone in 3.5x days?
(SSC CGL Tier-1 2023 (25 Jul · Shift 2 · 11:45 AM))
- 18/25
- 4/5
- 7/10
- 3/4
Answer (Detailed Solution Below)
Option 3 : 7/10
Detailed Solution
Concept approach
(Image shows A does 1/3 of work in 32 days.) A = 96 d, B = 64 d (37½% in 24), C = 80 d (60% in 48)
⇒ B + C = 9/320, A + C = 11/480 per day
⇒ (9x/320) : (11(x + 8)/480) = 9 : 11
⇒ x = 16
⇒ C in 3.5x = 56 days = 56/80 = 7/10
A किसी कार्य का 1/3 भाग 32 दिनों में कर सकता है, B उसी कार्य का 37½% भाग 24 दिनों में कर सकता है, जबकि C उसी कार्य का 60% भाग 48 दिनों में कर सकता है। B और C ने साथ मिलकर कार्य शुरू किया और x दिनों तक कार्य किया। x दिनों के बाद B ने कार्य छोड़ दिया और A, C के साथ जुड़ गया और दोनों ने शेष कार्य (x + 8) दिनों में पूरा किया। यदि (B + C) द्वारा मिलकर किए गए कार्य और (A + C) द्वारा मिलकर किए गए कार्य का अनुपात 9 : 11 है, तो C अकेले 3.5x दिनों में उसी कार्य का कितना भाग पूरा कर सकता है?
(SSC CGL Tier-1 2023 (25 Jul · Shift 2 · 11:45 AM))
- 18/25
- 4/5
- 7/10
- 3/4
उत्तर (विस्तृत हल नीचे)
विकल्प 3 : 7/10
विस्तृत हल
कॉन्सेप्ट से हल
(चित्र में A, 32 दिन में 1/3 कार्य करता है।) A = 96 दिन, B = 64 दिन (24 दिन में 37½%), C = 80 दिन (48 दिन में 60%)
⇒ B + C = 9/320, A + C = 11/480 प्रति दिन
⇒ (9x/320) : (11(x + 8)/480) = 9 : 11
⇒ x = 16
⇒ C के 3.5x = 56 दिन = 56/80 = 7/10