Selection KeySelection KeyFree Mock Test
View this question in:

A can do 1/3 of a piece of work in 32 days, B can do 37½% of the same work in 24 days, while C can do 60% of the same work in 48 days. B and C together started and worked for x days. After x days, B left the work and A joined C and both completed the remaining work in (x + 8) days. If the ratio of the work done by (B + C) together to the work done by (A + C) together is 9 : 11, then what fraction of the same work can be completed by C alone in 3.5x days?

(SSC CGL Tier-1 2023 (25 Jul · Shift 2 · 11:45 AM))
  1. 18/25
  2. 4/5
  3. 7/10
  4. 3/4
Answer (Detailed Solution Below)
Option 3 : 7/10

Detailed Solution

Concept approach

(Image shows A does 1/3 of work in 32 days.) A = 96 d, B = 64 d (37½% in 24), C = 80 d (60% in 48)

⇒ B + C = 9/320, A + C = 11/480 per day

⇒ (9x/320) : (11(x + 8)/480) = 9 : 11

⇒ x = 16

⇒ C in 3.5x = 56 days = 56/80 = 7/10

ऐसे ही सवालों के असली परीक्षा जैसे मॉक टेस्ट — मुफ़्तStart free test →