A and B can complete a work in 12 days and B and C in 16 days. A worked for 5 days and left, B worked for 7 days and left, and the rest of the work was completed by C in 13 days. If they received ₹4800 as total wages, find C's share.

  1. ₹3000
  2. ₹1950
  3. ₹2600
  4. ₹3900
Answer (Detailed Solution Below)
Option 3 : ₹2600

Detailed Solution

Concept approach

Work 48: A + B = 4, B + C = 3. 5A + 7B + 13C = 5(A + B) + 2(B + C) + 11C = 20 + 6 + 11C = 48

⇒ C = 2

⇒ C's work 26

⇒ 26/48 × 4800 = ₹2600